Expression of Interest - Trade Wastewater Treatment Facility

13th May 2020
Available for lease or acquisition - the wastewater treatment assets formerly used for treatment of winery wastewater at the Barmera Wastewater Treatment Plant site. These assets including large lined storage / treatment dams, have been maintained in excellent order and are no longer required for Council related purposes.

Details including technical specifications can be viewed on the Council website at www.berribarmera.sa.gov.au.

Site visits are by appointment only and can be requested by email talexander@bbc.sa.gov.au or phone to Tracey Alexander on 8582 1922

Expressions of interest should be received no later than 5pm, Tuesday 30th June, 2020, with written submissions marked as follows:

Post:    “Expression of Interest – Trade Wastewater Treatment Facility”

Ms K Burton,
Chief Executive Officer
Berri Barmera Council
PO Box 229
BERRI  SA 5343

Email: bbc@bbc.sa.gov.au (“Expression of Interest – Trade Wastewater Treatment Facility” to entered in the ‘subject ‘line), or

Fax: (08) 8582 3029 or delivered to the Berri Barmera Council Office, 19 Wilson Street, Berri.

Technical details of the facility please note the following:

  • A site layout drawing is attached. Note that this is a shared site with the STEDS treatment. Essentially the lagoons marked AL1, AL2, EL1 and EL2 are the trade waste components, along with their subsequent pipeline connections and electronic components.
  • AL1 and AL2 are both 5ML. Currently only AL1 is connected to inlet pipework due to low volumes, however AL2 can be connected readily enough if required (although it will come at a cost).
  • EL2 is 65ML and EL1 is approximately 55ML.
  • P&IDs are also attached along with a general asset list. Note in drawing BAW-00-7-003 there are STEDS assets in there as well that aren’t part of the system.