Berri Riverfront Precinct Redevelopment

Redevelopment Project

The Project commenced in the beginning of 2016 with development of Berri Riverfront Precinct Master Plan. The objective of the planning exercise is described below:

To develop spatial planning design, technical scope and specifications for capital works associated with potential upgrade of area between Ahern Street / Riverview Drive and Clarke Road Berri. Key drivers include Berri Resort future development, Council development for former Bowling Club site, and future potential development of Caravan Park and potential modifications to road networks to enhance amenity and multi use opportunities. Other key issues include connectivity and linkages to other precincts and areas within Berri Township and surrounds and also tracks and trails in vicinity of the Riverfront Precinct. Activities include consultation with key stakeholders and wider community, development of concept plans for workshop planning with Council Members, articulation into other strategic plans and Council’s Development Plan.

RETROFIT

At the Ordinary Meeting of Council held 27 January 2021, Council decided that the most suitable course of action regarding the Berri Riverfront Retrofit project would be to continue with redesign works as outlined in the public consultation 3D design simulation. Recognising how important the Berri Riverfront Retrofit project is to the community, Council held a second public consultation featuring the proposed design in a 3D/fly through simulation format. The simulation provided the community with a visualisation of how the outlined design adjustments would resolve numerous issues that had been outlined in the initial public consultation held in March 2019. By providing this 3D simulation, residents were able to compare the current design to the proposed retrofit and advise of their preference as to how they would like to see Council proceed with the project.

Following consideration of the submissions from the two public consultations, and after some deliberation, Council has decided that retrofit works are required as the design adjustments will provide added comfort for road users and increase the safety of the riverfront area.

Mayor Hunt on behalf of Council thanks all members of the public who provided their input to help Council make an informed decision on this important community asset.

For more information and to view the fly though please click here.

COMMENCEMENT OF PROJECT


The foundation work required was completed in the 2015/16 financial year with a Traffic Management Concept Plan being developed which considers the key spatial determinant within this precinct-namely traffic movements and treatments. The initial traffic solution for vehicles, pedestrian and walking/cycling in the precinct provided the ‘base map’ around which all other spatial elements can be accommodated such as landscaping, street infrastructure, walking/cycling paths, art and functional design elements, disability access and commercial opportunities. From this exercise the Precinct vision continues to be developed which in turn drove more in depth planning, design and investigations of delivery opportunities including funding and staged development.

STAGE ONE

Focus shifted onto Stage One of the project in late 2016 with preparation of detailed design for redevelopment of the area between Ahern Street and Vaughan Tce west and narrowing of Riverview Drive to generate widened public areas and improved amenity. The successful Places for People Funding application was announced in June 2017 and confirmed delivery of Stage One works by August 2018.

Flow diagram - Stage One

Design Drawing - Stage One Riverfront Project

AN EXTENSION OPPORTUNITY

An opportunity arose in late September 2017 to prepare a further funding application for Stage One extension between Ahern Street and approximately 80 metres east along Riverview Drive as depicted below. The application was submitted in October with the Berri Hotel Group committing $200,000 towards the estimated capital costs of $432,000. Should funding be successful Stage One extension works will be delivered in combination with the Stage One construction during 2018. If not successful in gaining funding the Stage One extension will be incorporated into Stage Two design, consultation and works program.

Flow diagram - Stage 1 ext

Design Drawing - Extended Stage One Riverfront Project

STAGE TWO VISION

Further activity on Stage Two planning was advanced during August to October 2017 and then placed on hold whilst awaiting further advance in the design of Berri Hotel car park and resort development on the former Bowling Club site.

Public Consultation for stage two closed on 29th June 2018.    Berri Barmera Council undertook stakeholder and community consultation on the Berri Riverfront Redevelopment Stage Two concept plan for redevelopment of Riverview Drive and adjacent reserves from the eastern side of the Hotel entrance to the old Boat ramp and adjacent to the caravan park.

Previously, a high level concept plan had been developed to illustrate the potential redevelopment of the combined stages in a precinct view. Since that time, the Berri Hotel Group have progressed their vision for the former bowling club site. Considerable effort has been made to integrate the design of paths and landscaping in Council’s project into the Hotel design to blend the public and private spaces and create the highest possible quality environment for tourists, locals and importantly people of all ages and mobility.

Flow diagram - Stage Two

Masterplan Concept Drawing

PROJECT STRATEGIC OBJECTIVE

The precinct redevelopment aims to achieve the following key deliverables:

  • Continued two way vehicle movements through the precinct with no restrictions
  • Improved access for pedestrians and cyclists throughout the precinct
  • Wider riverside public spaces generated by reducing road width
  • Traffic calming environment to emphasise shared use zone
  • Economic benefits through providing a revitalised environment and new business opportunities
  • Purpose designed spaces to support civic and entertainment events
  • Integration of public and private spatial design to maximise connectivity throughout the precinct - including synergy with major tourist accommodation developments planned and underway at Caravan Park and Hotel
  • Improved disability access throughout the precinct including to the new wharf
  • Riverbank stabilisation
  • Opportunities for River Vessels to have direct access to Riverfront precinct.

Riverfront Project Photogallery

ENGAGEMENT ACTIVITIES TO DATE

The overall project commenced in late 2015 in association with the demolition of the Berri Bowling Club and sale of land. This also coincided with conversations between the Hotel and Council on traffic planning for the precinct. It was decided that a Precinct Master Plan should be developed to capture all critical spatial planning and guide future development of public spaces.

During the first half of 2016 funding was sought to assist the progression of the Master Plan. Initial funding applications were unsuccessful. To enable the project to progress Council committed design funds in the 2016/17 Budget allowing a concerted effort to be made to prepare a fully designed and costed funding application for the November 2016 round of DPTI Open Space Funding. This included a decision by Council to stage the development, with Stage One being the Vietnam Veterans Memorial and VIC Civic Space between Ahern Street and Vaughan Tce.  With only a short period of time for preparation of the funding application, targeted and community consultation occurred during late 2016. Subsequently the funding application lodged early 2017 was successful and resulted in $500, 000 of funding support for the Stage One capital works which are valued at $1m.

Another round of funding was brought forward to October 2017 which represented a rare opportunity to apply for further funding. To assist in lodging a shovel ready project for funding , Stage One extension works were advanced to detailed design. In addition, to  ensure nil budget impact to Council, the Berri Hotel Group offered to commit $200,000 towards the capital costs with balance being  Open Space funding (if successful) and in kind Council support.

Project Updates - Riverfront Redevelopment

Latest News items from the Berri Riverfront Redevelopment Project

Now Open- Berri Riverfront Wharf

24 July 2019
Mayor Peter Hunt officially opened Berri’s Riverfront Wharf today showcasing the $1.5M project.

Wharf Works Progressing

20 December 2018

Berri Riverfront Wharf project

16 November 2018
The transformation of Berri’s Riverfront precinct continues with works to commence on the $1.3M Riverfront Wharf project to increase mooring facilities and extend the walkway along the river’s edge.

Official Opening - Berri Riverfront Development

30 August 2018
The community is invited to join in the official opening celebrations of the new Berri Riverfront Precinct on Saturday 8 September 2018.

TRAFFIC CHANGES – Riverfront Development Roadworks

16 August 2018
As stage one of the Riverfront Precinct redevelopment moves towards completion, there will be a full closure of  the intersection of Ahern and Riverview Drive.

Riverfront  Redevelopment On Track

7 August 2018
As works come to a conclusion at the end of Vaughan Terrace, we remind  people that there will be diversions in place to ensure traffic flows and for the safety of pedestrians and contractors.

Riverfront Traffic Restrictions 4 June to end June

25 May 2018
Changed Traffic Flow along Riverview Drive have been designed for the next stage of construction.

Berri Riverfront Redevelopment Taking Shape

16 May 2018
Berri Barmera Council’s major redevelopment of Riverview Drive from Vaughan Tce to the Berri Hotel entrance is progressing steadily towards the finish date of mid August

Berri Riverfront Redevelopment Mid April Update

20 April 2018
Last week beginning April 9 saw fences and signage going up, machinery coming to site and the initial works commence in earnest. This week we see heavy machinery excavating the southern side of Riverview Drive and the project moving ahead under more favourable weather conditions than last week’s short but intense heatwave.

Riverview Drive Traffic Restrictions

5 April 2018
During April to June works on the southern half of Riverview Drive adjacent the Visitor Information Centre and Café.

Stage One to commence

29 March 2018
Works will soon begin Berri Riverfront Redevelopment, with project contractors to commence site preparations after Easter.

Berri Riverfront Wharf

22 November 2017
If you hear some banging around the Berri township during this week, it is more than likely coming from the sheet pile testing being undertaken down the riverfront as part of new wharf development project. The project is in its early stages and these works are required to assist the detailed design.

Funding success for the proposed Berri Riverfront Wharf project

7 July 2017
The Minister for Transport and Infrastructure, Hon Stephen Mullighan MP recently announced that the Berri Barmera Council’s proposed Berri Riverfront Wharf has been successful in securing nearly $600,000 in funding for the $1.199M project.

Open Space Funding Application for Section of Riverview Drive

16 February 2017
Council has recently lodged an application for funding from the Department of Planning Transport and Infrastructure (DPTI)  for a redevelopment of area around the Vietnam War Memorial and Visitor Information Centre at Berri. Successful projects will have funding announced in the middle of this year. Should the project proceed it will see Riverview Drive intersection with Vaughan Terrace narrowed and the public areas on either side of the road widened for both everyday use and events. In particular the Vietnam War Memorial is located very close to the kerbs of Vaughan Terrace and Riverview Drive. In consultation with Riverland Vietnam Veterans a design has been developed creating significantly more space around the Memorial for events, quiet contemplation and paying respect.

ENGAGEMENT ACTIVITIES PLANNED

Stage Two Planning will be subject to Stakeholder and Community Consultation from April 2018. Importantly the adjacent proposed Hotel resort development on the former Berri Bowling Club land is advancing in design late 2017 and will be an important addition to the Precinct planning and consultation during 2018. Council has undertaken an integrated planning exercise with the Hotel’s design team to ensure both public and private realms have a high level of design connectivity and synergy. This will then enable the community to view the area from Ahern Street to the Caravan Park as a whole precinct and understand the proposed connection between public and private spaces.

PROJECT MANAGER CONTACT DETAILS

For further information please contact Council on  8582 1922